Chesterfield Borough Council has issued a positive progress update on the £19million project to renovate and remodel the theatre and museum space of the Grade II listed building on Corporation Street, and create a new café bar, education and community facilities.
Though it is not due for completion until 2025, workers from construction contractor GF Tomlinson have encountered many dramatic moments already, as they peel back the layers of history which have built up since the building first opened in 1879 as a library and lecture hall.
Other architectural features have been in plain sight all along, but are now cast in a different light as each room takes on a different character.
These images offer residents a glimpse behind the scenes and into the past, as well as the shape of things to come.
To learn more about the project, visit chesterfield.gov.uk/stephenson-memorial-hall.

5. Stephenson Memorial Hall progress
The upper floor will become Chesterfield Museum, with expanded spaces to tell the story of the town and a new lift to ensure access for everyone. Photo: Chesterfield Borough Council

6. Stephenson Memorial Hall progress
These high ceiling rooms were originally the reference library and later used for museum storage but will become exhibition galleries. Photo: Jakt Photography

7. Stephenson Memorial Hall progress
These stained glass windows in the auditorium have been have been hidden behind layers of insulation and wood for many years. Photo: Jakt Photography

8. Stephenson Memorial Hall progress
Panelling will be installed outside and the windows backlit so they can be enjoyed between performances. Photo: Jakt Photography

